Fire protection & smoke extraction

All installation situations at a glance: the Wildeboer installation flyer

Modern fire protection is facing new challenges: sustainable building materials such as clay, the growing wood construction sector and flexible installation solutions are becoming increasingly important. Wildeboer is responding to these developments with new, tested installation situations, combining maximum safety with efficient and sustainable solutions.

We have taken these developments as an opportunity to provide you with our installation flyer, which offers a comprehensive overview of all tested installation situations for a wide range of requirements.

New installation options for maximum safety and flexibility

Our new solutions provide flexible, efficient and sustainable options for optimising fire protection in modern construction projects. We focus on resource-saving and time-saving installations that meet the highest safety standards.

Our new installation options enable fire dampers to be installed safely in a wide range of materials and constructions – from solid wood to walls with clay panels. This is how we bring future-proof solutions to construction practice that both ensure fire protection and meet the requirements of sustainable building.

The following new installation options are available to you:

Installation in walls with clay panels

Sustainable building requires new, ecological solutions – and Wildeboer has the right answer. The FK90 and FR90 fire dampers can now be reliably integrated in walls with clay boards using mortar or clay plaster mortar. This method of construction combines fire protection with ecological advantages:

  • Sustainable and environmentally friendly: clay panels are 100% recyclable, conserve resources and are harmless to the environment.
  • Optimal building physics features: regulation of humidity, pollutant absorption and up to 56 dB sound insulation
  • Proven safety: non-combustible according to DIN EN 13501-1 and tested for a fire resistance period of 30/ 60/ 90 minutes

Installation in solid wood constructions

The FK90 and FR90 fire dampers now offer even more flexibility for installation in solid timber construction. The tested combination with fire protection foam allows for:

  • Flexible installation: In combination with the installation subframe ER8 (for the FK90) or installation subframe RH (for the FR90), gaps of up to 45 mm can be securely sealed with fire protection foam. And that even with uneven installation openings!
  • Particularly suitable for thinner walls and ceilings with a fire resistance period of 30/ 60/ 90 minutes.
  • Alternative installation options:
    • Dry installation with installation subframe
    • Wet installation without frame with mortar

Installation in the soft seal

With the new tested installation situation, the installation of the FK90/FR90 fire damper in the soft seal is now even more flexible:

  • Extended installation options: Now possible with further tested soft seal systems from various manufacturers
  • Simplified installation: Larger distances to the wall (up to 600 mm) enable larger and easier to create installation openings

For detailed information on the individual installation situations, please refer to our user manuals:

Experience our solutions live at the ISH 2025. Visit us at hall 8.0, stand C91 and let our experts advise you.

We look forward to your visit.